Guest

Ron Goetter

Middle River Hobbies

Front End -0 degree arm sweep

-.5mm arm mount spacers

-2nd hole in on inner mount

-arm centered (2mm front and rear)

-stock arm spacing

-700cst oil 3 hole pistons w/xray 3.0 springs

-Locked gear diff with VBC ECS shafts

-1.5mm xray bar to run this bar you must put a .5mm shim between the bulkhead and sway bar mount

-5mm right height

-Droop 2mm above ride height

  • -2 camber 1 toe out

-shock 4 holes out on tower stock on arm

-2 deg toe

-.5mm arm mount spacers

-camber link all the way in on the inner mount (longest hole on the inner mount) and inside on the hub with stock spacers

-stock arm mount spacing

-700 cst w/ 3 hole pistons and Xray 2.6 spring

-5.5mm ride height

-Droop 2mm above ride height

-VBC green bar

-Gear diff with 1000cst oil

  • -1 3/4* camber

-2nd hole out on tower and stock on arm